Rolls Royce

Client

Rolls Royce Energy Systems

Location

Mt. Vernon, Ohio

Architect

TLF

Overview

Two 75’ tall structural steel power generator and compressor unit test buildings located in the middle of an existing 100+ year old manufacturing facility. In total we excavated 30,000 cubic yards of soil for the building pads and utility trenches; installed 1,403 tons of structural steel;  installed 311 tons of rebar in the walls, slabs, and foundations; placed and finished 7,600 cubic yards of concrete in the foundations, walls, slab, and site concrete; and installed over 67,000 SF of metal siding and liner panel. All of our work took place while the plant was fully functional with three shifts.